Monthly Archives: June 2015

//June
­

Coordination Study, Setting and Commissioning of the Protection System in HYATT ZIVA HOTEL

AGS-PMC has developed the electrical study and settings of the protection system in HYATT ZIVA HOTEL, placed in MONTEGO BAY, JAMAICA, which is being built in this moment by HUMICLIMA. The experience and confidence of AGS-PMC in this kind of studies and medium and high voltages systems, was the key value to be the only [...]

By |June 2nd, 2015|news|0 Comments

AGS, in collaboration with GE MULTILIN and GE OIL&GAS, has performed the FAT in GE OIL&GAS NUOVO PIGNONE, Massa Plant, Italy.

AGS, in collaboration with GE MULTILIN and GE OIL&GAS, has performed the FAT in GE OIL&GAS NUOVO PIGNONE, Massa Plant, Italy. The test of pre-commissioning and commissioning of the GCPP for Aasta Hansteen (25MVA), Egina (38MVA) and the pre-commissioning of Gina Krog (41 MVA) were successfully done. The Egina project is located in Nigeria, the [...]

By |June 2nd, 2015|news|0 Comments

This is a demo store for testing purposes — no orders shall be fulfilled.