FAT in GE OIL&GAS NUOVO PIGNONE, Massa Plant, Italy

AGS, in collaboration with GE MULTILIN and GE OIL&GAS, has performed the FAT in GE OIL&GAS NUOVO PIGNONE, Massa Plant, Italy, for the following projects: FPSO Pioneiro de Libra: pre-commissioning and commissioning tests of the GCPP for a 24 MVA generator. Test bench for Yamal project: pre-commissioning and commissioning tests of the GCPP for a [...]

By |November 22nd, 2015|news|0 Comments

Start-up of protection panel of one generator unit in TUPRAS

AGS, in collaboration with GE MULTILIN and GE OIL & GAS, has performed the start-up of protection panel of one generator unit in TUPRAS refinery facilities located in Körfez city, Kocaeli province (Turkey). For this purpose, it was carried on the primary tests commissioning of Generator Control and Protection Panel (GCPP) of the steam turbine [...]

By |November 22nd, 2015|news|0 Comments

Tests of two gas turbines in the JGC group refinery located in Algeria

AGS, in collaboration with GE MULTILIN and GE OIL & GAS, has performed the load tests of two gas turbines in the JGC group refinery located in BIR SEBA (Algeria). For this purpose, it was carried on the load tests commissioning of Generator Control and Protection Panel (GCPP) of both gas turbines of 25 MVA [...]

By |November 22nd, 2015|news|0 Comments

Commissioning in Luanda

AGS, in collaboration with GE MULTILIN and GE OIL&GAS, has performed the start-up of protection panel of one generator unit in refinery of Sonangol Company located in Luanda (Angola). For this purpose, it was carried on the tests commissioning of Generator Control and Protection Panel (GCPP) of the second gas turbine included in combined cycle [...]

By |November 22nd, 2015|news|0 Comments

Cold commissioning of a 30 MW generator in Turkey

AGS in collaboration with GE Multilin has successfully completed the cold commissioning of the protections of a 30 MW generator in a sulphuric acid production plant in Samsun (Turkey). AGS will be providing technical assistance again in November 2015 to complete the hot commissioning of the generator.