Monthly Archives: December 2015

//December
­

Modifications on Unit Control Panel

AGS, in collaboration with GE MULTILIN & GE OIL&GAS, has performed all necessary modifications on Unit Control Panel #2 (UCP2) to permit the TG operation in parallel mode with the national electrical grid in M“BOUNDI refinery facilities located in POINTE NOIRE (Republic of Congo) The new 6 kV switchboard configuration is shown in the below [...]

By |December 9th, 2015|news|0 Comments

This is a demo store for testing purposes — no orders shall be fulfilled.