AGS in collaboration with GE Multilin has successfully completed the cold commissioning of the protections of a 30 MW generator in a sulphuric acid production plant in Samsun (Turkey).
AGS will be providing technical assistance again in November 2015 to complete the hot commissioning of the generator.