Completed secondary testing G60 protection relay (Generator), Control Panel functionality and protection and both wired interfaces (contacts) and analog (transducers) and digital (Modbus communication) in the first two powered units (A and B) within CLOV project in South Korea.

The project consists of an oil-refinery FPSO (Float Production, Storage and Overboard) 2,300 million, part of a set (FPSO – underwater structure for phase separation of oil) with a total cost of 9,000 million dollars.

AGS, as a subcontractor to General Electric and in rotation with this staff, is in charge of the protection of the four generators that supply the power used in the FPSO and partially control and interconnection between its subsystems (excitation, power management, control turbine and switches)