AGS, in collaboration with GE MULTILIN & GE OIL&GAS, has performed all necessary modifications on Unit Control Panel #2 (UCP2) to permit the TG operation in parallel mode with the national electrical grid in MĀ“BOUNDI refinery facilities located in POINTE NOIRE (Republic of Congo)

The new 6 kV switchboard configuration is shown in the below picture and the connection with the national grid was made through the 12, 5 MVA step up transformer.

Technical support during the test activities in collaboration with another vendors as Proger, Dietsman or ABB.

Pointe Noire Rep. Congo