Project Description

The test of pre-commissioning and commissioning of the GCPP for Aasta Hansteen (25MVA), Egina (38MVA) and the pre-commissioning of Gina Krog (41 MVA) were successfully done.

The Egina project is located in Nigeria, the field infrastructure consists of a subsea production system tied in to a Floating Production Storage and Offloading (FPSO) vessel with a processing capacity of 200,000 b/d and a storage capacity of 2,3 million barrels.

The Aasta Hansteen Project is the first deepwater platform development in the Norwegian sea, and the Gina Krog Project is located about 30 km NW of Sleipner, an estimated 225 million barrels of oil and gas, illustrates the importance of exploring and developing in mature areas with established infrastructure. Now we can extend the lifetime and exploit the available capacity on Sleipner for many years to come.