AGS-PMC in collaboration with GE Multilin carries out the commissioning in Ashegoda wind Farm, Ethiopy. This wind farm is located in Mekele, 1600 m over sea level. This country has huge lands with awesome green energy conditions. Wind Farm has 75 WTG 1.6 MW each one, protected by 5 F650 protection relays in each head line, mounted in Ormazabal panels. Precommissioning was done testing current, voltage and frequency protection functions. Also 79 Autorecloser were configured by logic and tested properly. This service allows AGS to increases the African countries list where has been present. Involved companies: AGS-PMC/GE MULTILIN, VERGNET,ALSTOM & ORMAZABAL.