AGS-PMC in collaboration with GE Multilin, carried out a generator (44.7 MVA) protection commissioning to Phase 1, in a Biomass plant in Runcorn, Manchester (UK). The generator is protected by two G60´s protection relays (redundant protection) from UR family relays (GE Multilin). The TPS RUNCORN biomass plant has two important targets: -On the one hand biological waste treatment. -On the other hand, the steam generated on that treatment (combustion in specific boilers), is taken for use to create and to sell energy to national grid. In late 2014 or early 2015, will start the electrical activities on the Phase 2, where AGS-PMC hopes to participate.